75t/D Integrated Sewage Treatment Plant with Certification

Product Details
Customization: Available
After-sales Service: Whole Life Technical Service
Warranty: 1 Year
Still deciding? Get samples of US$ 200/Set
Order Sample
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Secured Trading Service
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 30 days
Quality Assurance
The supplier provides quality assurance
Raw-Materials Traceability
The supplier has traceability identification of raw materials
to see all verified strength labels (18)
  • 75t/D Integrated Sewage Treatment Plant with Certification
  • 75t/D Integrated Sewage Treatment Plant with Certification
  • 75t/D Integrated Sewage Treatment Plant with Certification
  • 75t/D Integrated Sewage Treatment Plant with Certification
  • 75t/D Integrated Sewage Treatment Plant with Certification
  • 75t/D Integrated Sewage Treatment Plant with Certification
Find Similar Products
  • Overview
  • Detailed Photos
  • Application
  • Product Parameters
  • process
  • Packaging & Shipping
  • Other products
  • Company Profile
  • FAQ
Overview

Basic Info.

Model NO.
HRXS-YTHC00066
Type
Sewage Water Treatment Equipment
Method
Combined Treatment
Usage
Industrial, Home, Agriculture, Hospital, Sewage Water Treatment Equipment
Capacity
75t/D
Weight(T)
5.6t
Process
Ao / A2o /A30 /Ao+Mbr
System
Fully Automatic Control System
Electricity
220V, 380V
Wall Thickness(mm)
6
Self-Priming Pump Power
1.5kw
Backwash Pump Power
2.2kw
Certificate
ISO9001, ISO14001, ISO45001, CE
Material
Carbon Steel Anticorrosion
Use for
Hospital,Slaughterhouse,Textile Dyeing,Printing
Installation Type
Underground / Onground
Colour
Grey/Silver/Blue/Balck/ Customerized
Manhole Material
Carbon Steel Anticorrosion
Control
Electric Control
Transport Package
Container Standard Packing
Specification
8000*2500*2500mm
Trademark
HRXS-IW80T
Origin
Weifang City Shandong Province China
HS Code
8421219990
Production Capacity
50000 Set /Year

Packaging & Delivery

Package Size
800.00cm * 230.00cm * 250.00cm
Package Gross Weight
56000.000kg
Lead Time
30 days (1 - 1 Sets)
To be negotiated ( > 1 Sets)

Product Description

75t/d Integrated sewage treatment plant with certification
75t/D Integrated Sewage Treatment Plant with Certification
Product Description

 

1.  According to the characteristics of the specific domestic sewage water quality, the advanced "AO+ disinfection" process is used, the treatment process is simple, the operation is convenient, the daily cost is low, the effluent is stable,.



2. the main equipment is steel structure, above-ground structure, the upper part can be covered with soil, planting flowers and trees, lawn, and further beautify the environment.



3. Waste Water Treatment
 is an aboveground plant which adopts the advanced Biological technology and the company's scientific research and engineering practice result.

 

 

Detailed Photos

1) it can effectively remove BOD5,COD and NH3-N. The device is characterized by the stable performance, effective treatment, economical investment, automatic operation, convenience of maintenance and small occupying space.

2) There is no need for construction, neither heating and heat preservation.

3) The surface can be used as green land or square land.It also can be placed on ground based on client's requirement.

4) As the most efficient sewage treatment device, it is widely used in treating the sewage in the area of senior hotels, village districts and residential districts, etc.

5) The water after treatment not only would meet the national emission standards. but also can be used to irrigation or re-used.
75t/D Integrated Sewage Treatment Plant with Certification

Application

75t/D Integrated Sewage Treatment Plant with Certification
Scope of application

 
(1)Hotel, restaurant, sanatorium, hospital, school waste water treatment;


(2) Residence community, villa district, village, town waste water treatment;


(3) Station, airport, seaport,service area and dock waste water treatment;


(4) Factory, mine, prison, beauty spot waste water treatment;


(5) All kinds of industrial sewage similar to the living domestic waste water, etc

 

Product Parameters

 
serial number  Model HRXS-IW75T
1 Capacity 75T/D
2 Meterial Carbon Steel anticorrosion
3 Treatment Wastewater,Sewage,Effluent Purification Recycle
4 Use for Hospital,Slaughterhouse,Textile Dyeing,Printing
5 Installation Type Underground / Onground
6 Colour Grey/Silver/Blue/Balck/ Customerized
7 Process AO / A2O /A30 /AO+MBR
8 Weight(T) 5.6T
9 Wall Thickness(mm) 6

10
Electricity
 220V, 380V

process

75t/D Integrated Sewage Treatment Plant with Certification
1) The sewage enters the rtificial grille first, and the solid waste in the domestic sewage is initially removed by the grille.
 

2) Then enters the regulating tank to adjust the water quality and quantity, and then is pumped to the Anaerobic tank by the lifting pump, and the organic matter in the sewage is decomposed, metabolized and digested by the anaerobic bacteria, so that the organic matter content in the sewage is greatly reduced. 


3) Then enters teh anoxic tank and the submersible agitator is arranged in the anoxic tank to perform nitrification and denitrification. Combined with aerobic denitrification and dephosphorization, the macromolecular organic particles are decomposed into small molecular organic particles, which can improve the biodegradability of the wastewater.

 

4) Then the sewage flows into the aerobic tank and conducts aerobic biochemical reactions. The substance is degraded by biological oxidation

5) And the effluent flows to the 
second setting tank for solid-liquid separation. The supernatant of the second setting tank flows into the clear water tank

6) 
The sludge in the second setting tank is returned to the Anoxic tank by the sludge return pump, and
the other part of the sludge is sedimented by itself to the sludge tank.

7)The sludge in the sludge tank is periodically dewatered by the sludge dewatering machine. The sewage sludge supernatant is returned to the conditioning tank by the mixed liquid reflux pump for further treatment.
75t/D Integrated Sewage Treatment Plant with Certification

 

Packaging & Shipping

75t/D Integrated Sewage Treatment Plant with Certification 75t/D Integrated Sewage Treatment Plant with Certification

Other products

75t/D Integrated Sewage Treatment Plant with Certification
75t/D Integrated Sewage Treatment Plant with Certification

Certification
75t/D Integrated Sewage Treatment Plant with Certification
75t/D Integrated Sewage Treatment Plant with Certification
75t/D Integrated Sewage Treatment Plant with Certification
 

Company Profile

Weifang Hairuixinsheng Environmental Protection Technology Co., Ltd.

      The company covers an area of 3300 square meters, has a group of professional and excellent technical personnel, senior engineers, environmental protection engineers, environmental protection professionals more than 30, rich professional knowledge and management experience, our team has developed a unique advanced oxidizing technology (LTOP), which provides a set of high-efficiency and low-cost system solutions for the treatment of difficult wastewater and waste gas and products.

  Hairuixinsheng environmental protection mainly engaged in industrial exhaust treatment, laboratory exhaust, laboratory wastewater, industrial wastewater, farm wastewater, medical wastewater treatment equipment manufacturing business.
    according to the factory production process, analyze the source of pollution, composition and gas production, pollution within the content and characteristics of various substances, chemical composition, the development of programs.
    will be reliable technology, excellent program design, sophisticated equipment processing capacity, professional and construction team, perfect after-sales service, to provide systematic one-stop solution for the enterprise's environmental problems, and work together for the sustainable development of enterprises!

75t/D Integrated Sewage Treatment Plant with Certification
75t/D Integrated Sewage Treatment Plant with Certification

 

FAQ

Q:How to pay?

A:TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.

Q:What is the delivery time?
A:It depends on order quantities. Generally speaking, the delivery time will be within 3-4 weeks.

Q:How to package the sewage treatment plant?
A:We use standard seaworthy package.

Q:How to keep your equipments from corrosion? 
A:We use the world-famous paint, like epoxy-coal tar pitch etc. What's more, we paint strictly according to the standard process.

Q:How to install after the equipments arriving destination?
A:We will provide detailed illustrations to you. And we will send a technicians to guide for installation and debugging. after debugging equipment, he will teach your workers how to use it and how to maintain it.

Q:How about the warranty?
A: If there is any malfunction of the equipment during the warranty period, our company promises to propose a solution within 24 hours. If it is caused by non-human causes, our company provides repairs free of charge and guarantees that the equipment is running well again.

Q:What's the certification do you have?
A: We have CE, ISO9001, OHSAS18001, ISO14001 Certifications.
Welcome to visit and conduct business cooperation!

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now