1 |
30 years' dredger manufacture workmanship. especially large water flow dredger field . |
2 |
Fortune 500 Company chosen supplier .Germany . American brand as the main conponents on my dredger. |
3 |
Enterprise credit rating AAA. Enterprise credit can ensure the product quality and all service . |
4 |
6 manufacture shops .R&D center, testing pool. |
5 |
Large production. ISO 9001 2015 quality system. CE certification so on . |
6 |
Presences more than 40 countries. |
-- Product Introduction --
This alluvial gold mining equipment is built according to customers detailed request and the local.Terrain the whole land mining equipment come along with the operation cabin,the storage hopper with Isolation fence(normally the hopper with grille to stop the unqualified material out), bucket feed converyor, sand and tone seprate screen,water injection system,ro-tating belt chute centrifuges secondary recovery chute.
According to the different material to choose the different selection mining methord,normally agitation chute with fixed chute for gold,jigger machinery for the diamond and tin so on,jigger machinery and centrifugal machinery so on can reach the 98% election mining rate the trailing can reclemation and sale All processing power from the generator sets or electric power .
We can according to the especially terrain to do the movalbe land mining truck .
-- Fine screening machinery introduce --
1 |
Agitate chute: this structure improve the the sectetion gold rate . can reach the 70%-80% . it is used conbine with the fixed chute (2 pictures) can reach the over 90%. power form the electric moter througt the transfer device to get the agitate. |
2 |
Fixed gold chute:it is always used with agitate gold chute . centrifuge and jig. can get the gold and diamond . it assist the jig and centrifuge to improve the seclection rate. |
3 |
Centrifuge : it is used for land and river gold .centrifuge make the material separated by solid liquid on a high-speed rotating screen, a vibrating power is attached to the material on the screen by the excitation system to realize the solid-liquid separation with automatic unloading. |
4 |
Jig: it is used for the land and river diamond . according to the material different proportion to get the damond .The pulsation curve of a jig is a sawtooth shape, with fast upward flow and slow downward flow.The whole bed rises slowly and decreases slowly, the effective loosening time is long, the screen surface handling capacity of the unit increases significantly, the lower limit of particle size recovery is reduced, and the feeding material with too small particle size saves a lot. |
-- Basic parameter --
Title |
Spec |
Overall length |
7m |
Overall width |
2.3m |
Overall height |
3.3m |
Throughput |
75-120m³/h |
Trommel diameter |
1.2m |
Trommel mesh |
6-10mm for choose |
Table area |
2.8m2 |
Table riffles |
rubber table riffles |
Power |
7.5kw-4p |
Water pump |
8 inch |
Water flow |
400m³/h |
Water lift |
32m |
Rated power |
52kw |
Rated speed |
1500r/min |
Operator |
1 |
Fuel consumption |
72kw*0.178L=12.8L/h |
Title |
Spec |
Overall length |
21.4m(including 11m belt conveyor) |
Overall width |
11.1m(including sluice) |
Overall height |
5.05m |
Throughput |
150-200m³/h |
Tommel diameter |
1800mm |
Trommel power |
15kw-4p |
Trommel mesh |
6.3mm(choose able) |
Table area |
22m2 |
Table riffles |
rubber table riffles |
Sluice area |
2*9m2 |
Hopper |
board thickness 8mm,6mmrubber lining |
Belt conveyor power |
7.5kw-4p |
Power set |
diesel |
Water pump |
12 inch |
Water flow |
1000m³/h |
Water lift |
32m |
Rated power |
150kw |
Rated speed |
1500r/min |
Operator |
1 |
Fuel consumption |
190kw*0.178L=33.82L/h |
—— Other device in the production line picture ——
—— Our service ——
1 |
we can send the export enginer to the site before doing the design . help the customers get the accurate design and solution |
2 |
we can let the customers what know hwo well the equipment by the video |
3 |
we can provide the 1-2 warrant and longlife technology support |
4 |
Testing product before delivery product |
5 |
Assist customers in formulating construction plans |
6 |
Free guide to equipment installation and debugging |
7 |
Train technical staff for customers |
8 |
we can send the engginer to the aboard for installation and free training wrokers |
—— Customer visits ——
