Secured Trading Service

Secured Trading Service

What is STS?

STS is an escrow service that protects both buyers and suppliers. Funds are held securely by Made-in-China.com until order terms (e.g., delivery, quality) are fulfilled

Key Advantages

Payment Protection:
Your payment is only released to the supplier after you confirm satisfactory delivery.Suppliers receive payment only upon your approval.
Dispute Resolution:
If issues arise (e.g., quality discrepancies, shipping delays), our team mediates and facilitates resolutions based on evidence.
Flexible Payment Options:
Supports credit cards (Visa/MasterCard), PayPal, Apple Pay, Google Pay, many local payment methods and T/T (bank transfer).

ISO Certified Custom Fermentation Machine for Special Working Environment Requirements

Product Specifications Select Now
Capacity
750kg/d
500kg/d
300kg/d
2 tons/d
Still deciding? Get samples of $ !
Request Sample
Product Details
Customization: Available
After-sales Service: Lifelong Technical Service
Warranty: 1 Year
Shipping
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Online Trading Protection
Payment Guarantee
T/T PayPal ApplePay GooglePay visa mastercard american express discover JCB diners club PIX SPEI OXXO PSE OZOW Platform-protected payments with refund support for eligible order issues.
Platform Logistics
Clearer shipment tracking with platform-supported logistics.
Inspection Service
Optional pre-shipment inspection for quality and quantity checks.
After-Sales & Dispute Handling
Platform-assisted dispute resolution, including refunds or returns when applicable.
Only orders placed and paid through Made-in-China.com Secured Trading are eligible for payment protection and the corresponding platform services.
Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

In-stock Capacity
The supplier has In-stock capacity
Fast Delivery
The supplier can deliver the goods within 30 days
Quality Assurance
The supplier provides quality assurance
Raw-Materials Traceability
The supplier has traceability identification of raw materials
to see all verified strength labels (18)
  • ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
  • ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
  • ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
  • ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
  • ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
  • ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
Find Similar Products
  • Overview
  • Product Description
  • Specification
  • Certifications
  • Main Products
  • Our Customer
  • Company Profile
Overview

Basic Info.

Model NO.
Incinerator
Condition
New
Certification
ISO, CE
Automation
Automatic
Screw
Multi-Screw
Treatment
Pyrolysis
Bin Volume(M³)
2
Heating Temperature (ºC)
0-150 Adjustable
Operating Voltage(V)
380
Capability(Kg/D)
700
Bin Inner Wall(mm)
8
Heating Layer(mm)
50
Bin Outer Wall(mm)
5
Thermal Insulation Layerr(mm)
50
Motor(Kw)
7.5
Heating Power(Kw)
24
Deodorization Tower
φ500*1800
Exhaust Fan(Kw)
0.75
Crane(Kw)
2.2
Exhaust Gas Treatment System Motor(Kw)
0.75
Crane Load Capacity
200kg
Transport Package
Wooden Box
Specification
FJ-2000
Trademark
Aoerheng
Origin
China
HS Code
8417809090
Production Capacity
1000 Sets / Year

Packaging & Delivery

Package Size
590.00cm * 230.00cm * 230.00cm
Package Gross Weight
3200.000kg

Product Description

ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
Product Description
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
1. Materials are fed into the inlet through a screw conveyor or elevator, and the feeding amount should generally not exceed 60% of the total capacity.  
 
2. Before starting the machine and feeding, activate the main shaft mixer first. After fermentation is complete, stop the mixing operation only after unloading. Depending on operational conditions, a small amount of residual material may be retained to help maintain temperature during adjustment.  
 
3. During equipment operation, no part of the body or hands should be inserted into the fermentation tank; hard foreign objects must not enter the fermentation tank.  
 Then, start the main mixer shaft and begin feeding.
4. The typical reaction time for this unit is 12 to 24 hours. For different fermentation requirements, special materials such as dead chickens or pigs can have their fermentation time set separately.  
 
5. To improve equipment efficiency and avoid peak electricity usage, start the electric heater to heat the thermal oil to the preset temperature 2–3 hours before beginning fermentation.
 
6. Each time, approximately 200KG of organic waste is added. In cases where more is needed, it can be added in multiple portions. The number of diseased pig heads to be added at one time should not be excessive. Large pigs can only be added one at a time, and small pigs should not exceed two. The interval should be about 20 minutes. The previous addition of the material should be based on its basic chopping state, and it is best to maintain it at 80mm below the cutting blade tip.
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
7. Before starting the knife roller motor, open the feed trough cover first to check the amount of residual material and observe the grinding and drying conditions.  
    The moisture content in the feed trough should be maintained at 40%-50% (by volume). A preliminary judgment can be made as follows: when you grab the material with your hand, no water is squeezed out, but once released, the material sticks together and does not disperse. Under these conditions, the specialized fermentation bacteria perform best. If the material is too dry, add water; if too wet, add bedding material to absorb excess moisture.
Step 1: Activate the bacteria: Keep one-third of the organic matter in the machine (add organic materials as needed according to the site conditions). Add 1KG of fermentation bacteria for every 1000KG of processing volume, evenly sprinkle it over the organic materials, and adjust the machine's humidity to about 40%-50%. 
Step 2: Decomposition and Fermentation: Put in the organic waste, close the machine door, and start the decomposition and fermentation process.
Step 3: Decomposition Complete: When the decomposition is complete and the residue meets the standard (no odor and humidity below 30%), it can be removed. 
 
Notes:
1. It can retain one-third of the organic matter within the machine. It is rich in activated bacterial strains, which can be used as the base material for the next use, thereby reducing the amount of bacterial usage.
2. If organic waste treatment is not carried out for more than 7 days, all the organic matter inside the machine must be removed. For the next use, follow the initial usage procedure.
Specification
No.
Specification
HRXS-1
HRXS-3
HRXS-5
HRXS-10
HRXS-15
HRXS-20
1
Equipment volume(m3)
2.5
5
10
15
25
35
2
efficiency volume(m3)
1
3
5
10
15
20
3
Stiring way
Blade
Blade
Blade
Blade
Blade
Blade
4
Heating power (kw)
15
20
30
40
50
60
5
Air cleaning system
purifier
PL500                          PL600
PL800                          PL1200                  PL1500
Induced draft fan
2.2
4
Circulating pump
2.2
4


6
Liquid culture spray system
Bacteria culture tank
Stainless steel  400*500 3kw
Pump
0.12
Discharge pump
0.25
7
Transmossion motor power
4
5.5
7.5
15
18.5
22
8
Air compressor power
3
4
4
5.5
7.5
7.5
Certifications
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
Main Products
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
Our Customer
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
Company Profile
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements
      Hairuixinsheng environmental protection mainly engaged in industrial exhaust treatment, laboratory exhaust, laboratory wastewater, industrial wastewater, farm wastewater, medical wastewater treatment equipment manufacturing business.
 
      According to the factory p  roduction process, analyze the source of pollution, pollution within the content and characteristics of various substances, chemical composition, the development of programs will be reliable technology, excellent program design, professional and construction team, perfect after-sales service, to provide systematic one-stop solution for the enterprise's environmental problems.
ISO Certified Custom Fermentation Machine for Special Working Environment Requirements

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Send Inquiry
Chat Now