Advanced Medical Wastewater Treatment Equipment with Comprehensive Filtration Technology
The sewage rom oral, dental, aborafory,operating room,animalhusbandrylaboratory,phystcal examination center,plastie surgery inst tuton,specialzed hospital ,ete. contains a large number of bacteria, germs, Norm eges and other pathogenic pathogens, as wellas chemical agents and radioactiveisctopes,which have the characteristics of space pollution, acuteinfectious diseases and latentinfections, and are very harmful.
According to the nature of sewage, the company has developed KH-series smal sewage treatment equipment.The equipmentuses physical methods to treat sewage,withou the need to add chemicals,and there will be no excessive chlorine emis ions,and no subsequent investmentcosts.The main process is precipitation +ozo ne disinfection fitration adsorption.-seriessmall medical sewage treatment equipment has been used in many cities and towns medical institutions at home and abroad, and has won unanimous praise from customers.
1. The precise pipeline liquid level sensor enables the equipment to automatically operate when there is water in the pipeline and to enter standby mode when there is no water.
2. The joint PLC fully touch control panel automatically calculates the sewage treatment volume, making the operation settings simpler.
3. The equipment is equipped with an internal sewage treatment tank. It discharges when the water level is high and stops when the water level is low, ensuring sufficient disinfection time.
4. The equipment comes with three layers of fuses that are not prone to burning out, and the operating sound is extremely low.
5. Ozone oxidation for disinfection and sterilization, with a sterilization rate of up to 99%, ensuring more thorough disinfection.
6. No need to add chemical agents, making the operation safer and more hygienic.
Ozone disinfection works by damaging and oxidizing the cell membranes, cytoplasm, enzyme systems and nucleic acids of microorganisms, thereby rapidly inactivating bacteria and viruses. Ozone is derived from electrolyzing air and has an extremely high killing rate for pathogenic microorganisms, bacteria and viruses present in medical institution wastewater.
The small-scale medical wastewater treatment equipment uses physical methods to treat wastewater, does not require the addition of chemicals, and there will be no phenomenon of chlorine exceeding the standard emission. It does not generate subsequent investment costs. The entire set of equipment operates automatically and does not require personnel management and maintenance.
1. The equipment should be installed indoors and should avoid direct sunlight. The working temperature environment of the equipment requires no lower than 0ºC.
2. The installation location of the equipment should avoid damp and dark areas. Appropriate ventilation should be carried out every day to ensure fresh and dry air.
3. When the equipment is running, the voltage must be stable.
4. Before the self-suction pump is powered on, it must be primed with water. It cannot run in idle mode, as idle running is likely to cause damage.
5. When shutting down and stopping the use of the equipment, the power switch of the equipment itself should be turned off after all the equipment stops operating.
6. During the operation of the equipment, regular inspections and checks should be conducted. Any abnormal conditions should be dealt with promptly.
7. When the self-suction pump malfunctions, the power supply of the self-suction pump should be disconnected first, and then the pump should be removed for maintenance.
8. The filter at the water inlet of the equipment should be cleaned once a week.
The company We specialize in crafting solutions for industrial exhaust, laboratory exhaust, laboratory wastewater, as well as industrial, farm, and medical wastewater treatment equipment.
By analyzing factory production processes, pollution sources, gas emissions, and the attributes of pollutants, including chemical components, we develop tailored programs.
Utilizing reliable technology, exemplary program design, and advanced equipment capabilities, along with a skilled construction team and outstanding after-sales service, we offer comprehensive, one-stop solutions to tackle environmental challenges, fostering sustainable enterprise development!
Q:How to pay?
A:TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
Q:What is the delivery time?
A:It depends on order quantities. Generally speaking, the delivery time will be within 3-4 weeks.
Q:How to package the sewage treatment plant?
A:We use standard seaworthy package.
Q:How to keep your equipments from corrosion?
A:We use the world-famous paint, like epoxy-coal tar pitch etc. What's more, we paint strictly according to the standard process.
Q:How to install after the equipments arriving destination?
A:We will provide detailed illustrations to you. And we will send a technicians to guide for installation and debugging. after debugging equipment, he will teach your workers how to use it and how to maintain it.
Q:How about the warranty?
A: If there is any malfunction of the equipment during the warranty period, our company promises to propose a solution within 24 hours. If it is caused by non-human causes, our company provides repairs free of charge and guarantees that the equipment is running well again.
Q:What's the certification do you have?
A: We have CE, ISO9001, ISO14001 Certifications.
Welcome to visit and conduct business cooperation!