Customization: | Available |
---|---|
After-sales Service: | Lifelong Service |
Warranty: | 2 Year |
Still deciding? Get samples of US$ 5000/Set
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The rapid and harmless biological fermentation system is composed of fermentation host equipment. liquid culture spray system.air supply system. exhaust and air purification system. feed/discharge system (optional. according to the intention of the user contract) and control system |
1 | Transmission part: the movement of the motor is adjusted to a reasonable speed through the hard tooth surface gear reducer, and then transmitted to the main shaft to make the stirring knife roll rotate. |
2 | Mixing part: the barrel body has a specially designed mixing Angle of the knife roller, in the rotation of multi-angle, multi-direction to promote the material, coupled with a wide range of material in the circumferential direction, so that the material quickly to achieve uniform mixing. |
3 | Barrel part: The barrel is u-shaped structure with heating jacket. |
4 | Barrel cover part: the barrel cover is provided with a plurality of holes, respectively for feeding, air intake, air intake, maintenance, exhaust, air and other purposes |
5 | Discharge valve: the discharge valve is installed at the bottom of the barrel to control the material flow and discharge. The discharge valve can be separated by motor, motor, electric and other forms. |
6 | Liquid culture spray system: in order to meet the technological requirements, in the process of material processing biological fermentation need to spray bacteria, spray liquid parts fixed on the end cover, by the feed pump will be supplied to the spray gun. |
7 | Air purifier (optional by users) : in order to meet the requirements of no three wastes and zero emissions, ammonia, hydrogen sulfide and water vapor generated in the early fermentation stage are connected to a closed air duct by an induced draft fan and treated by an air purifier to achieve the purpose of air purification and waste water recovery, so as to meet the requirements of environmental protection. |
No. | Specification | AOERHEN-1 | AOERHEN-3 | AOERHENG-5 | AOERHENG-10 | AOERHENG-15 | AOERHENG-20 |
1 | Equipment volume(m3) | 2.5 | 5 | 10 | 15 | 25 | 35 |
2 | efficiency volume(m3) | 1 | 3 | 5 | 10 | 15 | 20 |
3 | Stiring way | Blade | Blade | Blade | Blade | Blade | Blade |
4 | Heating power (kw) | 15 | 20 | 30 | 40 | 50 | 60 |
5 | Air cleaning system | purifier | PL500 PL600 | PL800 PL1200 PL1500 | |||
Induced draft fan | 2.2 | 4 | |||||
Circulating pump | 2.2 | 4 | |||||
6 | Liquid culture spray system | Bacteria culture tank | Stainless steel 400*500 3kw | ||||
Pump | 0.12 | ||||||
Discharge pump | 0.25 | ||||||
7 | Transmossion motor power | 4 | 5.5 | 7.5 | 15 | 18.5 | 22 |
8 | Air compressor power | 3 | 4 | 4 | 5.5 | 7.5 | 7.5 |
Before sale: 1. Select the device model. 2. Design and manufacture products according to customers' special requirements. 3.The factory sent engineers and technicians to inspect the site free of charge. |
Sale: 1. Product acceptance. 2. Assist customers in formulating construction plans. |
After sale: 1. Guide the installation and debugging of equipment for free. 2. Trained technical personnel for customers. 3. Train operators on site. |