|
Still deciding? Get samples of $ !
Order Sample
|
| Customization: | Available |
|---|---|
| Type: | Gravity Separator |
| Voltage: | 380V |
| Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
|---|
| Payment Methods: |
|
|---|---|
| Support payments in USD |
| Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
|---|
| Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
|---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency

|
Model |
HRXS-150 |
HRXS-200 |
HRXS-300 |
|
Capacity |
150tph |
200 tph |
300 tph |
|
Power |
150 kw |
200 kw |
300kw |
|
Bucket size/ cubic |
0.04 |
0.04 |
0.12 |
|
Clay Scrubber /mm |
φ1000*2000 |
φ1200*3000 |
φ1500*3000 |
|
Trommel Screen /mm |
φ1200*3000 |
φ1500*3500 |
φ1800*4000 |
|
Sluice Box |
2 sets |
3 sets |
4 sets |
|
Water Supply /m³ |
120 m³ |
240 m³ |
370 m³ |
|
Concentrators |
1 |
2 |
4 |
|
Recovery Rate |
98% |
98% |
98% |

| 1 |
Profestional people serve the technical consult. |
| 2 |
We are factory which can provide the higher quality and lower price. |
| 3 |
Offering spare parts at a discounted price. |
| 4 |
Responsible Sales team design team manufacture team available 24/7 to best serve clients. |
| 5 |
Free repair if quality problems happen. |
| 6 |
Provide professional service and providesolution in a timely manner. |
9. About us :
| 1 | Selecting equipment type |
| 2 | Designing and fabricating the products in accordance with the special requirements of the clients |
| 3 | Training technical personnel for our clients |
| 4 | Providing construction and technology consultations or working out proper construction schemes for those new, special or difficult projects |
| 1 | Assisting the clients preparing for the first construction scheme |
| 2 | Installing and testing the equipments |
| 3 | Training the first-line operators on site |
| 4 | Examining the equipment regularly |
| 5 | Taking the initiatives to eliminate the failure(s) rapidly at site |
| 6 | Distributing the guarantee fittings door-to-door |